Third Upgraded P-3 Orion Delivered To CBP | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Aug 28, 2011

Third Upgraded P-3 Orion Delivered To CBP

Aircraft Fly Primarily Drug Interdiction Missions

A third P-3 Orion with a new Mid-Life Upgrade (MLU) kit was delivered recently to U.S. Customs and Border Protection (CBP) by Lockheed Martin. This P-3 Orion joins the two similar aircraft that CBP is currently operating to support its critical homeland security missions. Lockheed Martin delivered the first CBP MLU P-3 in July 2010 and the second airplane in April 2011. From October 2010 to April 2011, CBP used P-3 Orions to stop more than 117,000 pounds of drugs worth more than $1.5 billion from entering the United States. To date, the amount of cocaine seized by CBP crews equals about $240,000 for every hour the P-3 flies.

File Photo

"U.S. Customs and Border Protection missions are essential in strengthening our nation's safety," said Ray Burick, Lockheed Martin P-3 Programs and Greenville Operations vice president. "Lockheed Martin is committed to partnering with the U.S. Customs and Border Protection team to provide affordable enhancements that will keep its P-3 Orion fleet operating at optimal performance levels for decades to come."

The MLU replaces all fatigue-life-limiting structures with enhanced-design components and incorporates a new metal alloy that is five times more corrosion resistant than the original material, greatly reducing the cost of ownership for P-3 operators. The MLU is the operationally proven solution that removes current aircraft flight restrictions and extends the structural service life of the P-3 up to 15,000 hours, adding more than 20 years of operational use.

CBP is under contract with Lockheed Martin to deliver 14 of its 16 P-3 Orions outfitted with MLU kits. Deliveries will occur through 2015. To date, Lockheed Martin has 71 MLU kits under contract with six operators from four nations.

P-3 Orion is the standard for maritime patrol and reconnaissance, and is used for homeland security, hurricane reconnaissance, anti-piracy operations, humanitarian relief, search and rescue, intelligence gathering, antisubmarine warfare and, recently, to assist in air traffic control and data gathering over the oil spill in the Gulf of Mexico.

FMI: www.lockheedmartin.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC