Lockheed Martin Wins Contract For P-3 Outer Wing Sets | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 04, 2008

Lockheed Martin Wins Contract For P-3 Outer Wing Sets

First Deliveries Expected In 2010

It's a significant -- and needed -- advance for an aging workhorse. Lockheed Martin announced Thursday it has won a $129.3 million contract to build a total of 13 new outer wing sets for the US Navy's fleet of venerable P-3 Orion reconnaissance planes. The all new production outer wings will be delivered to the Navy beginning in early 2010 for installation on selected aircraft.

"Lockheed Martin has a long, proud history of providing P-3 sustainment and support to the US Navy," said Ray Burick, Lockheed Martin vice president of P-3/S-3 programs. "This new wing order is the next step in that partnership."

Lockheed Martin's P-3 wing production line opened in March 2008 and is the cornerstone of the company's P-3 Aircraft Service Life Extension Program (ASLEP). Lockheed Martin currently has the Royal Norwegian Air Force and the US Customs and Border Protection Service under contract for P-3 Life Extension Kits, and has submitted a response to the Canadian Forces under a Request For Proposal. A proposal for the Taiwan P-3 fleet is also in work.

"As the P-3 Orion original equipment manufacturer, Lockheed Martin is uniquely qualified to sustain and support the world's P-3 leets," said Burick. "Aside from the operators of these aircraft, nobody knows the P-3 better than Lockheed Martin."

The complete ASLEP solution replaces the aircraft outer wings, center wing lower section and horizontal stabilizers with new production components. All fatigue-life limiting structures on the aircraft are replaced with enhanced-design components and improved corrosion-resistant materials that will greatly reduce maintenance costs over the aircraft's service life.

"Lockheed Martin is committed to providing a range of solutions that enables operational effectiveness for P-3 Orion operators worldwide for decades to come," said Burick. "We're fully prepared to support the US Navy and all our customers in their future maritime surveillance activities."

The Boeing P-8A Poseidon, expected to replace the Orions, isn't expected to enter service until 2013. The Navy will receive its first of five test P-8As in 2009.

FMI: www.lmco.com, www.navy.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC