B-52 CONECT System Completes Flight Test Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Fri, Dec 16, 2011

B-52 CONECT System Completes Flight Test Milestone

Program Poised For Low-Rate Initial Production Authorization

Required flight testing for the B-52 Combat Network Communications Technology (CONECT) program has been completed by Boeing. The milestone allows for low rate initial production (LRIP) authorization from the U.S. Air Force. The flight test program was conducted at Edwards Air Force Base, CA, by the USAF and Boeing.

File Photo

"Completion of the LRIP flight test phase means CONECT is ready to be reviewed by our customer for initial production authorization," said Scot Oathout, B-52 program director. "CONECT increases B-52 operational effectiveness by providing improved mission flexibility, increased situational awareness and new network-centric capabilities. In addition, CONECT paves the way for easier integration of future upgrades."

The CONECT modification provides the ability to change a mission, as well as change the target of a weapon, while the B-52 is in flight. The system provides increased situational awareness for B-52 crews by adding several communication data links and full-color LCD displays with real-time intelligence feeds overlaid on moving maps. CONECT also enables future B-52 improvements with its onboard, high-speed network.

FMI: www.boeing.com, www.af.mil

 


Advertisement

More News

ANN's Daily Aero-Term (10.13.25): Homing [ICAO]

Homing [ICAO] The procedure of using the direction-finding equipment of one radio station with the emission of another radio station, where at least one of the stations is mobile, >[...]

ANN's Daily Aero-Linx (10.13.25)

Aero Linx: European Regions Airline Association (ERA) The European Regions Airline Association (ERA) represents a diverse membership of over 50 airlines and more than 150 associate>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

NTSB Prelim: CubCrafters Carbon Cub

While On Short Final, About 300 Ft, The Pilot Performed A Forced Landing Near Trees On September 7, 2025, about 0932 eastern daylight time, a CubCrafters Carbon Cub EX airplane, N4>[...]

ANN's Daily Aero-Term (10.14.25): Severe Icing

Severe Icing The rate of ice accumulation is such that ice protection systems fail to remove the accumulation of ice and ice accumulates in locations not normally prone to icing, s>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC