AD: Engine Alliance Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Sep 25, 2019

AD: Engine Alliance Turbofan Engines

AD NUMBER: 2019-18-08

PRODUCT: All Engine Alliance (EA) GP7270 and GP7277 model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-16-04 for the products listed above.

AD 2019-16-04 required a visual inspection of the 1st-stage low-pressure compressor (LPC) rotor assembly, referred to after this as the “engine fan hub assembly,” for damage, a one-time eddy current inspection (ECI) of the engine fan hub blade slot bottom and blade slot front edge for cracks; and removal of parts if damage or defects are found. AD 2019-16-04 also required replacement of the engine fan hub blade lock assembly for certain GP7270 and GP7277 model turbofan engines.

This AD, for certain GP7270 and GP7277 model turbofan engines, reduces the compliance time for the initial ECI and requires repetitive ECIs of the engine fan hub blade slot bottom and blade slot front edge for cracks. This AD also retains the visual inspection requirements of the engine fan hub assembly for all GP7270 and GP7277 model turbofan engines.

This AD was prompted by an uncontained failure of the engine fan hub.

DATES: This AD is effective October 9, 2019. Comments must be received by November 8, 2019.

COST: The FAA estimates that this AD affects zero engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • ECI: 20 work-hours × $85 per hour = $1,700 per engine.
  • Visual inspection: 1 work-hour × $85 per hour = $85 per engine
  • Replace fan hub blade lock assembly: Labor: 25 work-hours × $85 per hour = $2,125. Parts: $28,000. Cost per airplane $30,125.

On-Condition Costs

  • Replace engine fan hub assembly: 50 work-hours × $85 per hour = $4,250. Parts: $790,500. Cost per engine: $794,750
FMI: AD

Advertisement

More News

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames On The Right Side Of The Airplane Analysis: The pilot reported that about 30 minutes in>[...]

ANN's Daily Aero-Term (11.22.25): Remote Communications Outlet (RCO)

Remote Communications Outlet (RCO) An unmanned communications facility remotely controlled by air traffic personnel. RCOs serve FSSs. Remote Transmitter/Receivers (RTR) serve termi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC