F-35C Completes Developmental Test Phase 2 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Mon, Feb 08, 2016

F-35C Completes Developmental Test Phase 2

Included 66 Catapult Launches And Traps Aboard CVN-69

The F-35C Carrier Suitability Test Team deployed aboard the USS Dwight D. Eisenhower (CVN-69) for Developmental Test Phase Two (DT-II) in October 2015. Trials with F-35C test aircraft CF-3 and CF-5 spanned nine days in operating areas near the Atlantic coast between Florida and Virginia. DT-II followed a successful round of initial sea trials in 2014.

The team completed sixty-six catapults and traps to expand the gross weight and crosswind operating limits established on USS Nimitz (CVN-68) during DT-I. These tests included catapult launches up to the maximum aircraft gross weight with full internal stores as well as the expanding crosswind limits for launch and recovery. This testing supported the official US Navy aircraft launch and recovery bulletin that is required for fleet F-35C pilots to conduct carrier qualifications in 2016.

Additional testing completed on board the Ike included a variety of Logistics Test and Evaluation, or LT&E, tasks required to prove the F-35C can be maintained and supported above and below deck in the shipboard environment of a Nimitz class carrier. This testing included an engine run and Integrated Power Pack, or IPP, run in the hangar deck, deck spotting, chaining, weapons loading, as well as F135 engine compatibility testing in the ship’s engine shop.

Overall, the test team completed all required test objectives and finished ahead of schedule. . Only one sea trial deployment remains during F-35C development and those sea trials will complete all testing necessary for a full Block 3F fleet operation envelope with internal and external stores. DT-III is planned for the summer of 2016 when the test team again takes CF-03 and CF-05 back to sea for several weeks of testing. This final test phase will primarily focus on expanding the aircraft operating limits with a variety of symmetric and asymmetric external store configurations.

(Image provided with Lockheed Martin news release)

FMI: www.navy.mil, www.lockheedmartin.com

Advertisement

More News

OSH25 Day Four Redux: Spirit SE-1!, H55 eFlyer, King Schools

Also: Centauri Aircraft Valkyrie, Meet the Admin, Night Airshow, Pelton Intv'w When we laid eyes on this critter, we fell in love… and then we learned the amazing story of t>[...]

ANN Thanks Our Speedy Sponsor... Blackshape!!!

Check out Blackshape in Oshkosh Display #190 Situated in the Apulian Aerospace district in Monopoli, Italy, Blackshape embodies the epitome of Italian craftsmanship, style, and qua>[...]

Alpha Systems AOA Guides ANN Oshkosh Coverage

A Powerhouse In Aviation Safety Technology, Visit Alpha Systems AOA at Osh Display#3124-3125 Alpha systems AOA has been developing and integrating Angle of Attack systems for the l>[...]

Pilot Mall Intro's High Flying Models To ANN Sponsor Lineup

High-Flying Models By PilotMall.com: Honoring Aviation's Legacy We are dedicated to preserving and celebrating our rich aviation heritage through stunning mahogany wood scale repli>[...]

CiES Fuels ANN's Oshkosh 2025 Special Event Coverage

CiES Has Pioneered Life Saving Technology Of Use To Pilots All Over The World... Booth 3119 CiES: CiES Inc. is the global leader in digital fuel quantity sensors for general aviati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC