AD: Raytheon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 11, 2004

AD: Raytheon

AD NUMBER: 2004-23-02
MANUFACTURER:
Raytheon
SUBJECT: Airworthiness Directive 2004-23-02
SUMMARY: The FAA supersedes Airworthiness Directive (AD) 87-22-01 R1, which applies to certain Raytheon Aircraft Company (Raytheon) 65, 90, 99, 100, 200, and 1900 series airplanes, and Models 70 and 300 airplanes. AD 87-22-01 R1 currently requires you to repetitively inspect the nose landing gear (NLG) fork for cracks. If cracks are found that exceed certain limits, AD 87-22-01 R1 requires you to replace the NLG fork with a serviceable part or an improved NLG fork (Kit No. 101-8030-1 S or Kit No. 114-8015-1 S, as applicable). Incorporating an improved NLG fork kit terminates the repetitive inspection requirements. This AD is the result of FAA's policy (since1996) to disallow airplane operation when known cracks exist in primary structure. This AD retains the inspection requirements of AD 87-22-01 R1, requires you to incorporate an improved NLG fork kit anytime a crack is found, and adds additional airplanes to the applicability section of this AD. We are issuing this AD to detect and correct cracks in the NLG fork, which could result in reduced structural integrity and inability of the NLG fork to carry design limit and ultimate loads.The reduced residual strength may cause separation failure of the NLG fork, which could result in loss of control of the airplane during take off, landing, and taxi operations.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20042302

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC