AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Sep 28, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-19-20

PRODUCT: Certain Boeing Model 737-200, -300, -400, and -500 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-25-06, which applied to the aircraft listed above.

AD 2010-25-06 required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

AD 2010-25-06 also provided for an optional repair, which terminated the repetitive inspections. For airplanes on which a certain repair was done, AD 2010-25-06 also required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

This AD retains the actions required by AD 2010-25-06 and expands the inspection area. This AD was prompted by additional cracking found in areas not covered by the inspections in AD 2010-25-06.

DATES: This AD is effective October 31, 2018.

COST: The FAA estimates that this AD affects 67 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - Up to 67 work-hours × $85 per hour = $5,695 per inspection cycle.
  • Repairs/replacements - Up to 76 work-hours × $85 per hour = $6,460* per aircraft

* All required parts are supplied by the operator. This cost is minimal, and the FAA has no way to determine what an operator would pay for these parts. The FAA has received no definitive data that would enable us to provide cost estimates for certain other repairs specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC