Dream Chaser Spacecraft Primary Structure Arrives In Colorado | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Oct 18, 2019

Dream Chaser Spacecraft Primary Structure Arrives In Colorado

Most Advanced High-Temperature Composite Spaceframe Delivered

The primary vehicle structure for Sierra Nevada Corporation's Dream Chaser spacecraft has been delivered to the company's Colorado production facility, kicking off full assembly of the spacecraft ahead of its first mission for NASA in 2021. The structure is the largest piece of technology to make up Dream Chaser and the most advanced high-temperature composite spaceframe ever built.

Sierra Nevada Corporation (SNC), the global aerospace and national security leader owned by Chairwoman and President Eren Ozmen and CEO Fatih Ozmen, announces the arrival of

“It’s an extraordinary engineering and manufacturing accomplishment,” said Eren Ozmen, chairwoman and president of SNC. “Our team has been looking forward to this day for a long time so that we can fully assemble America’s spaceplane in preparation for its first mission for NASA.”

The primary structure is a pressurized composite structure that will contain pressurized payloads heading to the International Space Station. The structure was manufactured by subcontractor Lockheed Martin and recently shipped from their Fort Worth, Texas facility to Louisville, Colorado, where Dream Chaser is being built and integrated by SNC.

“As the first building block of the spacecraft, it represents the first critical path hardware to be received in Colorado and launch of the assembly, integration and test (AI&T) phase of the program,” said former NASA space shuttle commander, astronaut and retired USAF pilot Steve Lindsey, now senior vice president of strategy for SNC’s Space Systems business area. “Dream Chaser is truly a state-of-art vehicle with cutting edge technology. This structure exemplifies its unique design and complexity.”

Highlights about the design:

  • Uses advanced composite 3D woven assembly methods and represents the most advanced high-temperature composite spaceframe ever built.
  • Structure is about 30 feet long by 15 feet wide and approximately 6 feet high and weighs roughly 2,200 pounds.
  • Materials include carbon fiber reinforced polymers (CFRPs), more traditionally referred to as “composites.”
  • The use of CFRP materials instead of aluminum and titanium alloys, lowers manufacturing costs for creating a unique, aerodynamically complex spaceframe design.
  • Composites decrease the amount of thermal protection required compared to an aluminum primary structure.
  • Advanced 3D woven construction minimize penetrations to the hot lower aeroshell.

Dream Chaser is scheduled to launch starting in late 2021 for at least six cargo resupply and return services to the International Space Station for NASA under the Commercial Resupply Services 2 (CRS-2) contract. The Dream Chaser Cargo System can carry up to 12,000 pounds of supplies and other cargo, and returns delicate science to Earth with a gentle runway landing.

(Image provided with SNCorp news release)

FMI: www.sncorp.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC