Apache Longbow Flies Toward Future With New Composite Rotor Blades | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Dec 11, 2003

Apache Longbow Flies Toward Future With New Composite Rotor Blades

Flight-testing of new advanced composite rotor blades for the Boeing-built AH-64D Apache Longbow logged an important milestone on Thursday, Nov. 6, as part of a program designed to enhance the performance of the aircraft while reducing its overall operating costs.

The flight test was a key milestone in the proposed Block III upgrades for the U.S. Army. Lasting 30 minutes, the test included a variety of forward, rearward and sideward maneuvers to confirm the structural integrity of the blades. All points on the test card were successfully completed. Produced by Boeing in Mesa, Ariz., the advanced composite rotor blades are designed to have longer service lives than the standard metal blades now in service on the AH-64D.

The test flight followed four years of development by Boeing and the U.S. Army/Industry Apache team. The new blades, flown by PVD001 the first production Apache Longbow, use advanced composites that were not available when the Apache Longbow was introduced in the early 1990s.

Use of advanced analytical tools led to significant cost reductions in the composite blade manufacturing process. In addition, the new blade is designed to result in a much longer operational life As a result the new main rotor blades will cost approximately 25 percent less than the current blades, and have almost double the operational life. That means an estimated 50 percent reduction in O&S costs.

The advantages of composite construction allowed the designers to incorporate more aerodynamically efficient airfoil shapes and a higher overall twist rate that will result in improved hover and forward flight performance for Apaches equipped with the new blades.

To further enhance the performance capability of the proposed Block III Apache, the new blade has been designed to the higher 3,400 maximum horsepower limit of the Block III upgraded drive system design. The composite blade has been extensively evaluated with full-scale component live fire tests to confirm that the new design will meet the same stringent ballistic tolerance requirements of the current design.

Flight testing is expected to confirm analytical predictions that the vibrations transmitted to the airframe from the new rotor design are at least as good as the current rotor and likely better in many operating regimes. The new blade design is expected to complete qualification testing in time for incorporation on the first Block III production aircraft.

Additional key elements of the U.S. Army’s proposed Block III upgrades for the Apache Longbow include enhanced engines and drive systems, the Joint Tactical Radio System, increased situational awareness, improved target detection and acquisition and other enhancements that would enter production after the completion of the Block II upgrades in 2006.

The blade has been design to fit all fielded aircraft (AH-64A & AH-64D).

Boeing is delivering 269 AH-64Ds to the U.S. Army through the year 2006 under the second of two multi-year contracts. The first contract, Multi-Year I covered 232 Apache Longbows for a total of 501. Boeing builds AH-64D Apache Longbow helicopters for the U.S. Army and for several international defense forces.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC