Boeing's Quick-Build 7E7 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Thu, Jun 05, 2003

Boeing's Quick-Build 7E7

Three Days?

Chris Stetkiewicz, quite possibly the best heavy-aviation writer not writing for ANN, has latched onto what may be the key to Boeing's future success with its new 7E7 design: it's the ultimate "quick-build" kit.

Boeing isn't worried about meeting any "51% rule," so it has taken its subcontracting experience to the next level: outsourced components will be virtually "snap-together" on the new machine.

Just as Levittown homes popped up in hours sixty years ago, the prefabrication level in Boeing's new ordered assemblies will allow "plug and play" to cover even such things as cockpits, wings, and empennage.

Stetkiewicz noted, "Using a combination of new technology, materials and production processes and unprecedented amounts of sub-contracting, Boeing would slash final assembly times by between 75 percent and 90 percent, said Mike Bair, senior vice president on Boeing's 7E7 project. 'We're trying to get as much of the work down before final assembly so we bring the airplane together in relatively complete pieces and put it together in relatively short time,' Bair told a gathering of business executives in Everett, Washington..."

Mr. Bair went on to say that, while normal final-assembly times are typically over three weeks, three days is within reach, using new techniques and highly-qualified vendors. The new machine is also set to employ extensive composite structures, including the fuselage. That alone is supposed to make possible a cabin altitude of typically 6000 feet, as opposed to the industry-standard 8500, leading to greater passenger comfort. The new plane is full of such innovations, for safety, comfort, and efficiency.

Boeing VP Bair also said a 7E7 could probably be built by a workforce of about 1000 people, a fraction of today's labor requirement.

With labor costs' always rising, with increased governmental demands of employers, with the other advantages of foreign-sourced and machine-made assemblies, the reduction in final assembly time looks like the best option, for Boeing's future.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (10.31.25): Minimum Sector Altitude [ICAO]

Minimum Sector Altitude The lowest altitude which may be used under emergency conditions which will provide a minimum clearance of 300 m (1,000 feet) above all obstacles located in>[...]

ANN's Daily Aero-Linx (10.31.25)

Aero Linx: African Civil Aviation Commission (AFCAC) At AFCAC, our Safety Strategic Objective is to enhance Aviation Safety and the efficiency of Air Navigation Services in Africa.>[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Airborne 10.30.25: Earhart Search, SpaceX Speed Limit, Welcome Back, Xyla!

Also: Beech M-346N, Metro Gains H160 EMS STC, New Bell Boss, Affordable Flying Expo Tickets NOW On Sale! Purdue University’s Research Foundation and the Archaeological Legacy>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC