AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Feb 19, 2020

AD: General Electric Company Turbofan Engines

AD NUMBER: 2020-01-55

PRODUCT: Certain General Electric Company (GE) GE90-110B1 and GE90-115B model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: This AD was sent previously as an emergency AD to all known U.S. owners and operators of the GE GE90-110B1 and GE90- 115B model turbofan engines with certain engine serial numbers.

This AD requires the removal from service of the interstage seal, part number 2505M72P01 or 2448M33P01, from the affected engines. This AD was prompted by a recent event involving an uncontained high-pressure turbine (HPT) failure that resulted in an aborted takeoff.

DATES: This AD is effective March 2, 2020 to all persons except those persons to whom it was made immediately effective by Emergency AD 2020-01-55, issued on January 17, 2020, which contained the requirements of this amendment. The FAA must receive comments on this AD by March 30, 2020.

COST: The FAA estimates that this AD affects 0 engines of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Remove interstage seal

  • Labor: 100 work-hours × $85 per hour = $8,500
  • Parts: $509,600
  • Cost per engine: $518,100
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC