Endeavour Crew Performs Final Pre-Launch Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Tue, Jul 17, 2007

Endeavour Crew Performs Final Pre-Launch Test

Simulated Launch Countdown Sets Stage For August 7 Launch

The seven-member crew for the next shuttle launch, STS-118, arrived at NASA's Kennedy Space Center in Florida on Monday evening for the terminal countdown demonstration test.

Often referred to as TCDT, the test is a final round of prelaunch training. It concludes with a simulated launch countdown for the crew and the launch team.

On Tuesday, the full crew visited the launch pad for fire suppression training and a driving lesson in the M-113 armored personnel carrier, which could carry them safely from the pad in an emergency.

Commander Scott Kelly and Pilot Charlie Hobaugh are scheduled to practice flying and landing the Shuttle Training Aircraft, which mimics the flying characteristics of a shuttle orbiter, Tuesday night.

As ANN reported, the space shuttle Endeavour arrived at Launch Pad 39A early July 11, and the STS-118 payload -- including the S5 truss, SPACEHAB module and external stowage platform 3 -- is secured inside the orbiter's payload bay.

Launch is targeted for the evening of August 7.

And Enough About The Spelling Bugaboo, Please

Mischievous scamps that we are, ANN was one of the first media outlets to pick up on an unfortunate error on a banner erected by NASA at Launch Pad 39A last week, proclaiming "Go Endeavor." Right sentiment, wrong spelling.

Within 90 minutes of the orbiter's arrival at the launch pad, NASA corrected the error (as seen in the photo above) but not before cameras captured the image, and transmitted it throughout the world. (See above, RE: "mischievous scamps.")

Turns out the erroneous spelling was the fault of a print shop NASA contractor Space Gateway Support used to create the banner. "Those guys are so embarrassed," Lisa Malone, director of external relations and business development at KSC, told Florida Today.

Due to the tight schedule, no one proofread the banner before it was put up at the pad.

"It was just a human mistake," Space Gateway Support spokesman Sam Gutierrez said. "But it's my department's responsibility, so I'll take the hit on that."

Hey, we understand. We can't begin to count the number of people who have misspelled Finfrock's name.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC