AgustaWestland Introduces AW139 Maintenance Enhancements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 19, 2013

AgustaWestland Introduces AW139 Maintenance Enhancements

Company Looks To Drive Down Costs, Increase Availability

AgustaWestland has introduced what it says are major enhancements to the Maintenance Program for the AW139 intermediate twin-engine helicopter, which will reduce maintenance and operating costs and enable operators to further increase aircraft availability and utilization. 

Thanks to the proven capabilities and safety demonstrated over nine years of operation with an in service fleet of now more than 580 helicopters that have accumulated approximately 750,000 flight hours so far, AW139 operators can now benefit from a new progressive maintenance program as well as life extensions on major transmission components.

The new progressive maintenance program allows more efficient maintenance planning, especially for those operators who need maximum availability for daylight missions and can resort to maintenance at night, such as in the offshore oil and gas support market. The introduction of the progressive maintenance program has been achieved as a result of the strong cooperation and partnership set up between the company, through its Customer Support & Training and Engineering departments, and customers via a dedicated Maintenance Improvement Team. The new maintenance plan will reduce direct maintenance costs and further increase aircraft availability and utilization.

In a continuing effort to drive down AW139 operating costs AgustaWestland has been able to extend the Time Between Overhaul (TBO) for the AW139’s Main Gearbox from the current 5000 flight hours to 6000 flight hours and the Tail and Intermediate Gearboxes from 5000 flight hours to 7500 flight hours. The 20% and 50% increase in TBO will be a significant benefit to operators in reducing their operating costs as well as making the aircraft even more competitive in the market it now dominates.

(Image provided by AgustaWestland)

FMI: www.agustawestland.com

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC