Boeing Submits Final NewGen Tanker Proposal To US Air Force | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Feb 11, 2011

Boeing Submits Final NewGen Tanker Proposal To US Air Force

Planemaker Claims Significant Fuel Savings Over Competing Airbus Tanker

The Boeing Company's final proposal for the U.S. Air Force’s KC-X tanker competition was submitted to the U.S. Air Force Thursday. The proposal offers a fleet of Boeing NewGen Tankers -- multi-mission aircraft based on the 767 platform -- that Boeing says will deliver superior capabilities to U.S. warfighters and burn 24 percent less fuel than the competing European Aeronautic Defence and Space (EADS) Company’s tanker. If selected, Boeing says its tanker will save taxpayers tens of billions of dollars in fuel costs over the next 40 years and support 50,000 American jobs with more than 800 suppliers in more than 40 states.


Boeing NewGen Tanker

“This decision is critical to America’s national security and its manufacturing base,” said Boeing Chairman, President and CEO Jim McNerney. “Our best-of-Boeing team has offered the most capable and fuel-efficient tanker that will enable the U.S. Air Force to continue serving as the world’s finest air refueling provider without breaking future defense budgets.”

“Our challenge is to replace the KC-135, one of the most valuable aircraft fleets in aviation history, and we responded to the U.S. Air Force’s requirements by proposing the best multi-mission airplane built by the most experienced people -- the NewGen Tanker,” said Dennis Muilenburg, president and CEO of Boeing Defense, Space & Security. “We have an integrated team that has spent the entire competition focusing on our customer and preparing to execute immediately after the contract is awarded. Boeing is ready to build America’s next tanker.”

“Our NewGen Tankers will be built using a proven low-risk, in-line manufacturing approach similar to the highly successful 737-based Navy P-8A, by an already trained and highly experienced U.S. work force at existing Boeing facilities that have delivered more than 2,000 tankers and 1,000 commercial 767s,” said Jim Albaugh, president and CEO of Boeing Commercial Airplanes.

Boeing has been designing, building, modifying and supporting tankers for decades. These include the KC-135 fleet, the KC-10 fleet, and four KC-767Js delivered to the Japan Air Self-Defense Force. The Italian Air Force formally accepted its first KC-767 tanker in December and will receive three more as part of its current contract. In addition to being ready now, the Boeing NewGen Tanker will continue to deliver capability and value to both warfighters and U.S. taxpayers for decades to come.

In a news relesase, Boeing says that the NewGen Tanker:

  • Saves taxpayers up to $36 billion in life-cycle costs compared with the competitor’s aircraft -- a difference that could pay for an additional fleet of 179 tankers.
  • Features a flight control design philosophy that places aircrews in command of the entire flight envelope rather than allowing computer software to limit combat maneuverability.
  • Provides Air Force pilots with an advanced digital flight deck featuring Boeing 787 Dreamliner electronic displays.
  • Includes proven air refueling technology and a modernized NewGen KC-10 boom with an expanded refueling envelope capability, increased fuel offload rate and fly-by-wire control system -- all from the company that invented the air refueling boom and has produced the world’s most capable and reliable tankers.
  • Delivers significantly more fuel, cargo, passengers and patients than the current KC-135 tanker in a widebody airplane with a narrowbody footprint that affords the Air Force invaluable flexibility for a variety of operations.

Boeing’s final proposal is the culmination of a process that began when the company started studying tanker requirements after the release of the Air Force’s draft Request for Proposal (RFP) in September 2009, followed by a final RFP in February 2010. Boeing responded to the final RFP by submitting an 8,000-page proposal on July 9, 2010. A contractor will be selected early this year to replace 179 of the 400 Eisenhower-era KC-135 aircraft currently in the Air Force fleet.

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC