Another Day, Another Quality Issue on 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Jun 12, 2023

Another Day, Another Quality Issue on 787

Supplier's Part Out of Spec, Exceeding Tolerances in Horizontal Stabilizer Assembly

The Dreamliner will see delays once again after Boeing discovered another manufacturing SNAFU inside the 787's construction.

The company said that it was inspecting all 787s in inventory in search of "a nonconforming condition related to a fitting on the horizontal stabilizer. The inspections and required rework will affect the timing of near-term 787 deliveries."

The issue is just the latest in a long line of quality woes encountered in the 787's troubled manufacturing history. The novel, liberal use of next-gen materials and lightweight composites have taken Boeing on a bit of a learning journey throughout the Dreamliner's production run, and recent issues continue that burgeoning tradition. 

The affected part is a fitting that joins the horizontal stabilizer, sized incorrectly by a supplier. The pieces, when installed, were found to have created a gap greater than allowed in the blueprints, which are limited to a few thousandths of an inch on paper. Repairs will end up taking some time, along with going over Dreamliners in inventory to ensure nothing similar occurred with them, too. The horizontal stab issue is separate from a recent problem with the vertical one, uncovered in April. In that case, the issue was blamed on a 'nonstandard' procedure, and affected a handful of fittings that attached the tail to the fuselage. That fix alone has added months to Dreamliner delivery schedules, making customers wonder just how long they'll have to wait to get the next batch. 

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC