Indonesia Places Blame For Lion Air Accident On Design And Oversight Lapses | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Sep 25, 2019

Indonesia Places Blame For Lion Air Accident On Design And Oversight Lapses

Draft Report Also Identifies Pilot Errors And Maintenance Mistakes

Design flaws by Boeing, lapses in oversight on the part of the FAA, and a string of pilot errors led to the crash of a Lion Air 737 MAX into the Java Sea almost a year ago, according to draft conclusions prepared by Indonesian investigators.

The Wall Street Journal reports that the details of the draft conclusions have not been disseminated, but they have been shared with the FAA and NTSB for comment. Boeing and the U.S. government agencies continue to work with Indonesian authorities, and plan to travel to that country to finalize the document. While the NTSB is not expected to have major disagreements with the draft, Boeing and the FAA are concerned that the documents will place too much emphasis on the design of the aircraft and the FAA's certification process.

The NTSB is expected to make safety recommendations calling for improvements in cockpit training and crew decision making. The board is also expected to have suggestions about the certifications of new airliners, including a reevaluation of the FAA's procedures delegating some certification authority to manufacturers.

Indonesia is also preparing safety recommendations related to the Boeing 737 MAX. None of those recommendations will be binding.

The FAA hopes that international aviation safety regulators will lift the grounding of the 737 MAX shortly after it recertifies the airplane, however EASA has said that it will conduct its own certification analysis before clearing the airplane to fly in European airspace, which could add months to the process.

The final version of the Indonesian report is expected to be released early in November, according to the report.

(Image from file)

FMI: Source report

Advertisement

More News

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames On The Right Side Of The Airplane Analysis: The pilot reported that about 30 minutes in>[...]

ANN's Daily Aero-Term (11.22.25): Remote Communications Outlet (RCO)

Remote Communications Outlet (RCO) An unmanned communications facility remotely controlled by air traffic personnel. RCOs serve FSSs. Remote Transmitter/Receivers (RTR) serve termi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC