Atlas V 521 Escapes Natures Wrath, Prepares For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Sep 30, 2004

Atlas V 521 Escapes Natures Wrath, Prepares For Launch

Hurricanes Ravaged KSC, But Caused No Problems For ILS/Lockheed Martin Vehicle

International Launch Services and Lockheed Martin are preparing for the final Atlas mission of the year, having come through a series of hurricanes with launch facilities relatively unscathed.

The next vehicle, an Atlas V 521 launcher designated AV-005, arrived at Cape Canaveral last week from the Lockheed Martin manufacturing center near Denver (CO). AV-005 is scheduled to launch the Lockheed Martin-built AMC-16 satellite for SES AMERICOM in December. ILS manages all Atlas missions.

"We want to reassure our customers that our facilities are intact and we are pressing ahead to meet our Atlas launch commitments," said ILS President Mark Albrecht.

The booster portion of the rocket was unloaded Friday, shortly before evacuations were ordered as Hurricane Jeanne approached the Central Florida coast. The vehicle was secured inside the Atlas Spaceflight Operations Center (ASOC), part of the state-of-the-art Complex 41 completed in 2002 to support Atlas V launches. Both the vehicle and the building came through the weekend storm undamaged.

Lockheed Martin has a detailed hurricane preparedness plan, with specific procedures to safe and secure all launch facilities. The company works closely with US Air Force and NASA weather forecasters to anticipate the impact of tropical systems.

"We are fortunate to have seen only minimal damage. Because we took precautions in building and securing the facilities, we are able to resume launch processing in a timely fashion," said Adrian Laffitte, Lockheed Martin director of Atlas launch operations. A company Damage and Recovery Team began assessing damages right after Hurricanes Frances and Jeanne moved on. At Air Force direction, Cape Canaveral facilities began closing for Frances Sept. 1, and were reopened by Sept. 9. They closed for Jeanne Friday, and staff began returning today, with a normal workday expected Wednesday.

Built to meet the latest Florida hurricane safety requirements, the ASOC and associated structures remained secure throughout the storms. Damages were slight and mostly external, and repairs necessitated by Frances' wind and rain were under way or completed by the time Jeanne passed through.

Lockheed Martin has an emergency management team that convenes during natural disaster events. This team held daily teleconferences throughout the storm periods for Hurricanes Charley, Frances, Ivan and Jeanne in August and September, and had vehicles and supplies ready to assist with recovery, should that have been necessary.

On Aug. 31, the Atlas team successfully launched an Atlas IIAS vehicle with a national security payload. This was the last launch from Pad 36A. Pad 36B will see its final launch in early 2005, with the final flight of an Atlas III vehicle and another national security payload. The buildings at Complex 36 withstood the storms with small rain leakage and minor exterior damage.

ILS has completed five successful launches on Atlas vehicles to date in 2004, and three on its other vehicle, the Russian Proton rocket. ILS is a joint venture of Lockheed Martin and Khrunichev State Research and Production Space Center of Russia. ILS markets and manages the missions on the Atlas vehicle in the United States and on the Proton rocket at the Baikonur Cosmodrome, Kazakhstan. ILS was formed in 1995, and is based in McLean, (VA).

FMI: www.ilslaunch.com, www.lockheedmartin.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC