Sat, Nov 07, 2015
Northrop Grumman Selected To Build The LRS-B
In a move that was not entirely unexpected, Boeing and Lockheed Martin have filed a formal protest asking the U.S. Government Accountability Office (GAO) to review the decision to award the Long Range Strike-Bomber (LRS-B) contract to Northrop Grumman.
Boeing and Lockheed Martin concluded the selection process for the Long Range Strike Bomber was fundamentally flawed. The cost evaluation performed by the government did not properly reward the contractors’ proposals to break the upward-spiraling historical cost curves of defense acquisitions, or properly evaluate the relative or comparative risk of the competitors’ ability to perform, as required by the solicitation.
That flawed evaluation led to the selection of Northrop Grumman over the industry-leading team of Boeing and Lockheed Martin, whose proposal offers the government and the warfighter the best possible LRS-B at a cost that uniquely defies the prohibitively expensive trends of the nation’s past defense acquisitions.
When the contract was awarded late last month, Air Force Secretary Deborah Lee James said that the the contract award process had been very straightforward and transparent.
The Long Range Strike Bomber contract is composed of two parts. The contract for the Engineering and Manufacturing Development, or EMD, phase is a cost-reimbursable type contract with cost and performance incentives. The incentives minimize the contractor’s profit if they do not control cost and schedule appropriately. The independent estimate for the EMD phase is $21.4 billion in 2010 dollars.
The second part of the contract is composed of options for the first 5 production lots, comprising 21 aircraft out of the total fleet of 100. They are fixed price options with incentives for cost. Based on approved requirements, the Average Procurement Unit Cost (APUC) per aircraft is required to be equal to or less than $550 million per aircraft in 2010 dollars when procuring 100 LRS-B aircraft. The APUC from the independent estimate supporting today’s award is $511 million per aircraft, again in 2010 dollars.
(Source: Boeing news release. Defense Department news release)
More News
Two San Mateo County Facilities Receive Swift Fuels San Mateo County announced that distribution of unleaded aviation gasoline at its airports is growing with the recent deliveries>[...]
Airspace Flow Program (AFP) AFP is a Traffic Management (TM) process administered by the Air Traffic Control System Command Center (ATCSCC) where aircraft are assigned an Expect De>[...]
Aero Linx: Government of India, Ministry of Civil Aviation The Indian aviation market is on a high growth path. Total passenger traffic to, from and with in India, during Apr-Nov 2>[...]
Also: X-59 Fires Up, BN2B-26 Islander Order, Plane Thief Pleads, CAE Launches Prodigy Draco Aircraft is aiming to raise $4.5 million to fund the development of its hyper short take>[...]
Also: Hartzell Expands, Japan V-22 Ills, RCAF H135 Deal, B-29 Doc On Tour Skyryse reservations for its Skyryse One First Edition helicopters have sold out in just six months. Early>[...]