First Flight: Boeing P-8A Poseidon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Tue, Apr 28, 2009

First Flight: Boeing P-8A Poseidon

Boeing's P-8A Poseidon test aircraft T-1 successfully completed its first flight April 25th, taking off from Renton Field at 10:43 a.m. and touching down at Boeing Field in Seattle at 2:14 p.m. The P-8A performed a series of flight checks, reached a maximum altitude of 25,000 feet, and landed after three hours, 31 minutes in the air.

"This is a significant accomplishment for the P-8A team, as it moves us one step closer to delivering the next maritime patrol and reconnaissance aircraft to the warfighter," said Capt. Mike Moran, P-8A program manager for the U.S. Navy.

"Today's flight is a clear demonstration of the program's commitment to delivering this critical capability on time and the result of a tremendous effort by the joint Navy/Boeing team. I commend Boeing for putting its 'A-Team' in place on this program and enabling the Navy to leverage Boeing's experience, expertise and, more importantly, dedication to make this aircraft a reality."

Prior to takeoff, the P-8A team completed a limited series of flight checks, including engine starts and shutdowns. During the flight, test pilots performed airborne systems checks including engine accelerations and decelerations, autopilot flight modes, and auxiliary power unit shutdowns and starts.

"This is an exciting day for the P-8A program and a tribute to the hard work of the entire team," said Bob Feldmann, Boeing vice president and P-8 program manager. "We understand the needs of the U.S. Navy and maritime patrol community, and we are dedicated to meeting every one of our future milestones on or ahead of plan."

The integrated Navy/Boeing team will begin formal flight testing of the P-8A during the third quarter of this year. Before that, Boeing will paint the aircraft, install additional flight test instrumentation and conduct a series of ground tests.

The P-8A, a derivative of the Next-Generation 737-800, is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. The team currently is assembling and testing the first five P-8As.

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is planned for 2013.

FMI: www.boeing.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC