Embraer's Second Phenom 300 Takes Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Thu, Aug 07, 2008

Embraer's Second Phenom 300 Takes Flight

Company's Experience Paying Off In Test Schedule

They're making it look easy. Right on schedule, Brazilian planemaker Embraer saw its second Phenom 300 light jet take flight Tuesday, departing from Embraer’s test runway at the Gavião Peixoto plant.

The crew for PP-XVJ's first flight consisted of Capt. Jeirgem Prust, Capt. John Sevalho Corção, and flight test engineer Leandro Bigarella. Before its maiden flight, the aircraft was tested for several hours, accomplishing, among others, the electrical power-on check, engine run, and systems integration evaluations.

"The Phenom 300 program is steadily moving forward. The first and the second aircraft are key pieces for the certification campaign," said Henrique Langenegger, Embraer Vice President, Programs – Executive Jets. "The qualification of our engineering teams, combined with the extensive use of technology, will certainly sustain the program’s firm progress."

As ANN reported, the first Phenom 300 flew in late April. That airframe concluded the Ground Vibration Test (GVT) in early June. Based on those results, the aircraft is going through performance checks, in order to define the final aerodynamic configuration.

In the meantime, the third and fourth Phenom 300s are in the assembly and pre-assembly stages, respectively. Four aircraft will comprise the fleet to perform the certification and maturity campaigns of the Phenom 300.

The first and second jets will be equipped with complete instrumentation, and the third and fourth test aircraft will be outfitted with the interior designed in partnership with BMW Group DesignworksUSA. Two other aircraft will be produced for the required structural ground tests (static and fatigue).

FMI: www.embraer.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC