Boeing Commercial Crew Program Passes NASA Hardware, Software Reviews | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Feb 14, 2014

Boeing Commercial Crew Program Passes NASA Hardware, Software Reviews

Critical Design Reviews Completed For LVA, Emergency Detection System

Boeing's Commercial Crew Program (CCP) recently completed a hardware design review and software safety test, bringing it closer to launching the Crew Space Transportation (CST)-100 spacecraft that will return Americans to space.

Boeing completed a Critical Design Review for the system's Launch Vehicle Adapter (LVA), which connects CST-100 to the United Launch Alliance Atlas V rocket. The CDR, which included wind tunnel tests verifying flight stability, confirmed that the LVA design is suitable for production.

Separately, the Atlas V rocket's emergency detection system, which communicates with the capsule and initiates emergency procedures, if needed, passed its evaluation.

"Safety is a key element of the CST-100, from the drawing board to design implementation and beyond," said John Mulholland, vice president and program manager, Boeing Commercial Programs. "These tests help to validate that the launch vehicle adapter and emergency detection system are fully functioning and able to ensure a safe launch for our future passengers."

These two milestones are part of NASA's Commercial Crew Integrated Capability (CCiCap) agreement with Boeing. Next in line for the program is a software review this spring and the more comprehensive Integrated CDR this summer. Boeing is on track to meet all 20 of its CCiCap milestones in 2014.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC