Pratt & Whitney PurePower PW1500G Engine Begins Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Jun 23, 2011

Pratt & Whitney PurePower PW1500G Engine Begins Flight Test Program

Maiden Flight Conducted On Modified 747SP From Mirabel, Quebec

Pratt & Whitney said Tuesday that its PW1500G engine took to the skies for its first flight on June 20, launching the engine family's first flight test program. The PW1524G engine for the Bombardier CSeries aircraft flew its maiden flight on Pratt & Whitney's 747SP flying test bed at Pratt & Whitney Canada's Mirabel Aerospace Centre, in Mirabel, Quebec (Canada). Open since May 6, this state-of-the-art facility, which features advanced manufacturing technologies, is where final production assembly and test will occur for both the PurePower PW1524G and P&WC's advanced PurePower PW800 family of engines for the next generation of large business jets.

"The engine performed even better than we expected on this first flight, building on the success of our ground test program," said Bob Saia, vice president, Next Generation Product Family. "To date, we have conducted nearly 400 hours of full engine ground testing. We are very pleased with the initial results, which have demonstrated the geared architecture's benefits of low fuel consumption, lower noise and a robust operational design. The engine is real, and it's flying now. We have four PurePower engines at test and five engines in the build phase."  This initial flight test program validates performance, engine operability and in-flight starting. 

In addition to full engine testing, Pratt & Whitney has performed critical part level and engine sub-system testing to validate designs for the PurePower engine program, including design validation of the Fan Drive Gear System, fan blade for bird ingestion and blade containment and compressor performance for the advanced PW1000G core.

The PurePower PW1000G series engines use an advanced gear system allowing the engine's fan to operate at a different speed than the low-pressure compressor and turbine. The combination of the gear system and an all-new advanced core are expected to deliver double-digit improvements in fuel efficiency, environmental emissions and noise.

The PW1500G engine test program will run a total of eight test engines over the next 18 months with engine certification scheduled for 2012. Entry into service is scheduled for 2013.

The day after the first flight, Pratt & Whitney announced that it had received commitments for the engine on 10 firm and up to 6 option CS100 CSeries aircraft ordered by an undisclosed major network carrier. The deal represents 20 firm PW1500G series engines covered by a PureSolution maintenance service agreement.

FMI: www.utcaero.com
 

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC