First P-8A Poseidon Moves From Final Assembly To Preflight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Aug 14, 2008

First P-8A Poseidon Moves From Final Assembly To Preflight

Scheduled To Enter Service With US Navy In 2013

Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered this week in Renton, WA to celebrate the completion of final assembly on the first P-8A Poseidon for the US Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton, home to commercial 737 production.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

FMI: www.boeing.com/ids, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC