Navy to Begin Initial Production Of P-8A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jan 26, 2011

Navy to Begin Initial Production Of P-8A

This First LRIP Contract Also Includes Spares, Logistics And Training Devices

The U.S. Navy announced today the award of a $1.6 billion contract to Boeing for P-8A Poseidon aircraft Low-Rate Initial Production (LRIP) of six aircraft. This first LRIP contract also includes spares, logistics and training devices. Production of the first LRIP aircraft will begin this summer at Boeing's Renton, Wash. facility.

"In 2004, the U.S. Navy and the Boeing Company made a commitment to deliver the next generation maritime patrol and reconnaissance aircraft to support a 2013 Initial Operational Capability (IOC)," said Capt. Mike Moran, PMA 290 Program Manager. "This contract and these aircraft keep that commitment on track."

Three of the six flight test aircraft, built as part of the System Development and Demonstration contract awarded to Boeing in 2004, are in various stages of testing at Naval Air Station Patuxent River, Md. The Integrated Test Team has conducted sonobuoy releases and counter measures deployments.

Recently, one of two static test planes completed full scale testing on the P-8A airframe. The first static test aircraft underwent 154 different tests with no failure of the primary structure. The second aircraft will begin fatigue testing this year. The U.S. Navy plans to purchase 117 production P-8A aircraft to replace its P-3 Fleet. IOC is planned for 2013 at NAS Jacksonville, Fla.

FMI: www.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC