The Boeing Strike is Over… What Now? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Nov 08, 2024

The Boeing Strike is Over… What Now?

Moody’s Shares Projections for Production and Financial Recovery

After a painful seven weeks, the Boeing strike has come to an end. The mega manufacturer faced tremendous financial loss during this period and will need to take bold steps to recover.

Boeing was forced to put a “complete halt” to production of its popular 737 model during the strike, which began on September 13 and ended on November 5. It also temporarily paused work on its 767, 777/777X, P-8, KC-46A, and E-7 in Washington.

To gauge the true impact of the event, Moody’s Ratings published its post-strike projections for Boeing’s production and cash flow.

“Prior to the IAM 751 machinists’ strike, we believed that Boeing would achieve its 38 per month 737 production target in the fourth quarter of 2025, and we do not believe the strike itself will hinder that projection,” noted Jonathan Root, Senior Vice President for Moody’s Ratings. “However, a stronger supply chain will be integral to Boeing promptly achieving the 38 per month target and then expanding from there.”

Prior to the strike, Moody’s had granted Boeing the Baa3 rating. This is already the bottom line of the long-term investment-grade category and includes obligations subject to moderate credit risk. If the manufacturer were to dip below Baa3, it would automatically become a member of Moody’s speculative-grade section and find it much more difficult to borrow funds.

For reference, Moody’s confirmed a rating of A-2 for Airbus in May 2024. This places the competitor in the medium-high grade, low credit risk section.

To get back on track, Moody’s claims, Boeing will need to finalize certification of its 737 MAX 7, 737 MAX 10, and 777-9 airliners. It must also improve the quality and efficiency of its manufacturing, including in its own factories and with Spirit AeroSystems.

“Relieving the impediments to achieving and then sustaining strong positive free cash flow remains the challenge,” Root continued. “We don’t believe these objectives will be achieved before 2026, and we estimate that free cash flow will be around negative $5 billion in 2025 and will be only modestly positive in 2026.”

FMI: www.moodys.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC