FAA: LA ARTCC Outage Blamed On Maintenance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Sep 17, 2004

FAA: LA ARTCC Outage Blamed On Maintenance

The Repairman Was Asleep At The Switch

Tuesday's comm meltdown at the Los Angeles ARTCC facility was caused by the FAA's failure to properly maintain equipment.  So says the FAA itself.

The disruption caused hundreds of flights in and out of Los Angeles, San Diego, other California airports, as well as Las Vegas, to be grounded. 

The problem occurred at the control center that handles high-altitude traffic for the southern California region. 

The FAA says a preliminary investigation found a 30-day maintenance check on the primary radio and voice communications system was never made. 

The system is designed to automatically shut down after a period of time if the maintenance work is not performed. 

There is a backup communications systems, but it failed to work because it wasn't configured properly.  The FAA plans to make adjustments to the radio system to prevent future automatic shut offs in the event maintenance is not completed. The FAA says there were no safety incidents as a result of the shutdown.

In the meantime, the controllers' union, NATCA, said the comm blackout caused at least five near-misses over California and Nevada.

"Three pairs (of planes) were so close that on-board collision avoidance systems were activated," said Mark Sherry, regional vice president of the union and a controller in the San Francisco tower, in an interview with the San Francisco Chronicle. "We had three controllers who couldn't do anything but watch their screens as two dots merged into one, then wait five or six seconds and hope that two came back out."

FMI: www.laartcc.org

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC