AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Jul 17, 2017

AD: Airbus Helicopters

AD NUMBER: 2017-10-12

PRODUCT: Airbus Helicopters Model AS332C, AS332C1, AS332L, AS332L1, AS332L2, and EC225LP helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires repetitive inspections of the intermediate gear box (IGB) fairing. This AD was prompted by separation of the IGB fairing from the fairing gutter and subsequent interference with the drive shaft.

These helicopters have been approved by the aviation authority of France and are approved for operation in the United States. Pursuant to our bilateral agreement with France, EASA, its technical representative, has notified us of the unsafe condition described in the EASA AD.

The FAA is issuing this AD because we evaluated all information provided by EASA and determined the unsafe condition exists and is likely to exist or develop on other helicopters of these same type designs and that air safety and the public interest require adopting the AD requirements as proposed.

The FAA estimates that this AD affects 11 helicopters of U.S. Registry and that labor costs average $85 per work-hour. Based on these estimates, we expect the following costs:

  • Visually inspecting each IGB fairing and the left- and right-hand attachment supports for a crack require a 0.5 work-hour for a total cost of $43 per helicopter and $473 for the U.S. fleet, per inspection cycle.
  • Replacing the IGB fairing requires 2 work hours and parts cost $2,600, for a total cost of $2,770 per helicopter and $30,470 for the U.S. fleet.
  • Replacing the attachment supports requires 2 work hours, and parts cost $1,100 for a total cost of $1,270 per helicopter.
  • Visually inspecting for a crack in the fairing gutter requires 0.5 work hour for a total cost of about $43 per helicopter.
  • Inspecting for interference and separation of the fairing gutter requires 0.5 work hour for a total cost of $43 per helicopter.
  • Replacing the inclined drive shaft tube requires 2 work hours, and parts cost $18,399, for a total cost of $18,569 per helicopter.
  • Replacing a hydraulic pipe requires 2 work hours, and parts cost $1,322, for a total cost of $1,492 per helicopter.
  • Repairing the flight control assembly requires 2 work hours, and parts cost $484, for a total cost of $654 per helicopter.

DATES: This AD is effective August 15, 2017.

FMI: AD

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC