New Personnel Recovery Capability Part Of HC-130J | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Sep 28, 2011

New Personnel Recovery Capability Part Of HC-130J

First Combat King II Delivered To The U.S. Air Force

The first HC-130J Combat King II has been delivered to the U.S. Air Force's Air Combat Command (ACC). It was flown to Davis-Monthan Air Force Base, AZ, by Gen. Norton A. Schwartz, chief of Staff of the U.S. Air Force. This aircraft is the first of 11 currently on order with Lockheed Martin.

File Photo

"It's an honor to have flown this magnificent aircraft from Marietta today," said Gen. Schwartz during today's ceremony.  "It's a significant milestone for the personnel recovery and the combat search and rescue community.  The capability of the HC-130 Combat King II is an order of magnitude greater than any of its predecessors, and I have to tell you it's certainly better than any Herc of any variety that I have ever flown."

"Yet again, we see the C-130 delivering a new capability," said Lorraine Martin, Lockheed Martin vice president for C-130 programs. "This new C-130J configuration gives ACC unparalleled capability for its personnel recovery mission. As worldwide demand for the C-130J increases, we see more ways this flexible aircraft meets the demands of any operator for any mission."

The new aircraft, which is based on a KC-130J tanker baseline, has the Enhanced Service Life Wing, Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an electro-optical/infrared sensor, a combat systems operator station on the flight deck, and dual Satcom. In-line production of this configuration reduces cost and risk, and meets the required 2012 initial operational capability.

FMI: www.af.mil, www.lockheedmartin.com 

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC