Another Dreamliner Setback -- First Flight Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jun 23, 2009

Another Dreamliner Setback -- First Flight Delayed

First Flight Of B787 Postponed, No New Date Set

Boeing announced Tuesday that first flight of the 787 Dreamliner will be postponed due to a need to reinforce an area within the side of the fuselage of the aircraft.

The need was identified during the recent regularly scheduled tests on the full-scale static test airplane. Preliminary analysis indicated that flight test could proceed this month as planned. However, after further testing and consideration of possible modified flight test plans, the decision was made late last week that first flight should instead be postponed until productive flight testing could occur.

First flight and first delivery will be rescheduled following the final determination of the required modification and testing plan. It will be several weeks before the new schedule is available. The 787 team will continue with other aspects of testing on Airplane #1, including final gauntlet testing and low-speed taxiing. Work will also continue on the other five flight test aircraft and the subsequent aircraft in the production system.

Scott Carson, president and CEO of Boeing Commercial Airplanes said a team of experts has already identified several potential solutions.

"Consideration was given to a temporary solution that would allow us to fly as scheduled, but we ultimately concluded that the right thing was to develop, design, test and incorporate a permanent modification to the localized area requiring reinforcement. Structural modifications like these are not uncommon in the development of new airplanes, and this is not an issue related to our choice of materials or the assembly and installation work of our team," Carson said.

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC