Grant Approved For Repair Work At Paine Field | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Sep 20, 2011

Grant Approved For Repair Work At Paine Field

Most Recent Grant Is For $8.2 Million For Improvements To Runway Infrastructure

Snohomish County in Washington State has received an $8.2 million federal grant for repair work at the county’s Paine Field Airport. With approval Friday by County Executive Aaron Reardon and the County Council, the federal Airport Improvement Grant from the FAA will be used to repair the paved shoulders along the main runway by installing edge drains, repaving the shoulders, and installing a new electrical duct bank system.

The existing electrical system is more than 50 years old, and this work will bring the runway edge lighting and signage in line with FAA standards. “Thousands of Snohomish County jobs depend on keeping Paine Field’s main runway in top shape,” said Snohomish County Executive Aaron Reardon. “It is a key part of this state’s aerospace industry.”

“This grant will allow critical upgrades and repairs to our facilities at Paine Field, assuring it remains a world class center for aviation and our aerospace industry,” said Dave Somers, chair of the Snohomish County Council.

Runway 16R-34L is the main jet runway at Paine Field and is the only runway that supports the large aircraft manufactured by Boeing as well as aircraft refurbished at Aviation Technical Services (ATS). County executives say the project is necessary in order to meet FAA design standards and has been identified as a top priority for the county airport.

Combined with $11 million received in 2009 from federal American Recovery and Reinvestment Act (ARRA) funds, the airport will nearly complete an overhaul of the airport’s main runway and taxiway system.

FMI: www.co.snohomish.wa.us

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC