Boeing 777 AD Incoming for GE90 Engine Parts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 08, 2023

Boeing 777 AD Incoming for GE90 Engine Parts

Another Day, Another Little Problem on the Production Line at Boeing

The GE Aerospace turbofans powering the Boeing 777 might have some issues with contaminated iron, with pieces of the high-pressure turbine discs, rotor spools, and compressor seals affected.

A proposed airworthiness directive follows a string of GE Aerospace findings pointing to “iron inclusion” in powdered metal parts. The additional iron represents a weak point in the engine, resulting in parts that fail to meet longevity and strength specifications as designed. Premature failure and even uncontained engine failures are always a wildcard whenever fan blades, discs, spools and the like aren’t up to snuff - and an AD would help to insure that any affected parts stay on the ground where they belong.

GE Aerospace isn’t sour about the issue, saying the AD is ”consistent with existing GE recommendations to operators and reflects our proactive approach to safety management”. They maintain that the affected parts do not endanger flight safety (which is likely true thanks to the relative youth of the 777 fleet), and corrective actions will be put in place to prevent similar issues in its engines going forward. 

The AD is on track to become a final order once the comment period ends on October 20th. Once in effect, it would require replacement of “affected HPT stage 1 disks, HPT stage 2 disks, forward HPT rotor seals, interstage HPT seals, and stages 7–9 compressor rotor spools.”

FMI: www.federalregister.gov

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC