Field Aerospace Wins Contract To Modify Gulfstream GIV-SP | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jun 04, 2018

Field Aerospace Wins Contract To Modify Gulfstream GIV-SP

Would Convert A Business Jet Into An Airborne Test Bed

Field Aerospace has secured a contract with an undisclosed customer to complete the initial design phase to modify a Gulfstream GIV-SP aircraft into an airborne test platform, which could lead to additional contracts to perform two subsequent phases.

 
Field Aerospace won the Phase I initial design contract through a competitive bid for the three-phase program. Phase II is the critical design stage and Phase III is the fabrication, installation, testing and FAA certification.
 
During the performance period that begins in the spring, Field Aerospace’s engineering team will design a solution to convert the GIV-SP aircraft from a corporate transport into an aircraft capable of safely performing a variety of scientific investigations, as well as system verification and validation in an airborne environment.
 
For the initial design phase, Field Aerospace will design many exterior and interior mechanical and electrical modifications which incorporate various sensors and mission systems, using an adaptable architecture which allows the addition of new capabilities in the future.
 
“This program represents a unique opportunity that allows Field Aerospace to further develop a relationship that was started with our customer many years ago on a previous airborne test platform, and utilizes our expert skill set to produce another very versatile research platform,” said John Taylor, vice president and general manager of Field Aerospace’s Oklahoma City location. “We are confident that our initial design will lead to securing the next two phases, which are within our core capabilities.”

(Source: Field Aerospace news release. Image from file)

FMI: www.fieldaero.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC