New Mission Launch Command Center To Be Built At Wallops Flight Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Wed, Sep 02, 2015

New Mission Launch Command Center To Be Built At Wallops Flight Facility

NASA Awards Contract For Construction Of The 14-Thousand Square Foot Mission Launch Command Center

NASA has awarded a contract to Harkins Contracting Inc. of Salisbury, Maryland, for the construction of a new Mission Launch Command Center (MLCC) at the agency’s Wallops Flight Facility in Wallops Island, Virginia.

The new 14,174 square-foot facility will serve as the hub for interfacing with and controlling rockets, their payloads and associated launch pad support systems during flight operations at Wallops.

“The Wallops launch range mission set has seen steady growth, transformation and diversification over the years,” said Bill Wrobel, Wallops Flight Facility director. “This new MLCC is a critical modernization project that will meet the needs of our operations today and take us well into the future.”

Recent operations underscoring the need for the new command center include commercial cargo resupply flights to the International Space Station, Department of Defense missions, and NASA’s Lunar Atmosphere and Dust Environment Explorer (LADEE), the first lunar mission to launch from Wallops.

This award is a firm-fixed price contract with a value of $5.6 million.

The Leadership in Energy & Environmental Design (LEED) Silver MLCC is a single-story facility that will be built on the main base of Wallops. The scope of the work includes asphalt and concrete paving, construction of storm water structures, extension of communications and electrical ducts, as well as connecting the facility to existing water, electric and sanitary systems.

The building will consist of a steel frame with concrete masonry unit exterior construction, a modified bitumen roof, glass and metal storefront and curtain wall systems. Additional work under this contract includes the installation of a heating, ventilation, and air conditioning system, electrical systems, and interior architectural finishes, as well as verifying all construction requirements have been met.

The launch command center currently in use was designed in the 1950s to accommodate discrete, quick-turnaround missions characteristic of the Wallops Range mission set at the time, which included Project Mercury tests and suborbital rocket flights.

“The current command center has served us well over the years, but doesn’t have the capacity to meet the needs and requirements for advancing our nation’s goals and objectives in space,” said Wrobel.

Today, launch missions from Wallops embrace the facility’s traditional role in testing new technologies along with enabling research and scientific investigations, in addition to taking on larger-scale operations using small- and medium-class solid- and liquid-fueled rockets.

(Images provided by NASA. Top: Artists rendering of new MLCC. Bottom: Existing facility)

http://www.nasa.gov

Advertisement

More News

USCG MH-60 To The Rescue (Again) -- Rescues 4 Boaters

Capsized Vessel Located Near Dauphin Island, Alabama The Coast Guard rescued four boaters after their vessel capsized near Dauphin Island, Alabama, Thursday. Coast Guard District E>[...]

Gray Eagle Order Placed for Army National Guard

Reserve Components Looking to Improve In-House General Atomics Aeronautical Systems announced a fresh order for a dozen Gray Eagle 25M UAVs with accompanying equipment, for fulfill>[...]

Aero-Biz Survival 101 (1120a): Expert Ideas To Help You Through Tough Times

Brand New! Avoid The Need For A Comeback... Get Your Marketing Right, Right Now! Some time ago, the Aero-News Network, responding to numerous requests, established a marketing and >[...]

Airborne 06.03.24: Rotax 915/916 SB, Starship 4 Ready?, B-17 Mementos

Also: Hubble On Pause, FedEx Pilots Picket, Nexus eVTOL, VFS Honors The Rotax folks have published a Service Bulletin after issues were noted that may affect all R915i and R916i se>[...]

Mid-Continent Instruments and Avionics Mourns Former Leader

John W. Winter of AEA and Avionic Fame Passes John W. Winter brought Mid-Continent Instrument Company into the modern era in 1980, purchasing the firm and using it as a base for ex>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC