US Navy Orders 3rd Phase Of P-8A Low-Rate Production, Bringing Total To 24 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Sep 25, 2012

US Navy Orders 3rd Phase Of P-8A Low-Rate Production, Bringing Total To 24

Boeing Receives $1.9 Billion Contract For 11 Poseidon Aircraft

The U.S. Navy has awarded Boeing a $1.9 billion contract for 11 P-8A Poseidon aircraft, which will take the total fleet to 24 and bolster the service's anti-submarine, anti-surface warfare and intelligence, surveillance and reconnaissance capabilities. This third low-rate initial production award announced Friday follows two last year that totaled 13 aircraft. Boeing has delivered three of the production P-8As, which are based on the company's Next-Generation 737-800 commercial airplane, and the Navy plans to purchase 117 to replace its P-3 fleet.

"This contract is a stepping stone to full-rate production, and our focus remains on building Poseidon on cost and on schedule," said Chuck Dabundo, Boeing vice president and P-8 program manager.
 
"It has been an exciting and productive year for the P-8A program," said Capt. Aaron Rondeau, P-8A deputy program manager for the Navy. "The fleet operators in Jacksonville are excited to have received their first three aircraft and look forward to the next delivery as they transition from the P-3 to the first P-8 fleet squadron."
 
Boeing assembles the P-8A aircraft in the same facility where it builds all its 737 aircraft. The Poseidon team uses a first-in-industry in-line production process that draws on Boeing's Next-Generation 737 production system. All P-8A-unique modifications are made in sequence during fabrication and assembly. After assembly, the aircraft enter Boeing's mission system installation and checkout facility for final modifications.
 
The Boeing-led team also has built and is testing six flight-test and two ground-test aircraft under a Navy System Development and Demonstration contract awarded in 2004. The test aircraft have completed more than 600 sorties and 2,500 flight hours to date.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC