Sikorsky Receives Contract To Build 12 CH-53K Heavy Lift Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Wed, May 22, 2019

Sikorsky Receives Contract To Build 12 CH-53K Heavy Lift Helicopters

Aircraft To Be Built At Connecticut Plant With Deliveries Beginning In 2022

Sikorsky will build 12 production CH-53K King Stallion helicopters under a new $1.13 billion contract from the U.S. Navy. These advanced helicopters are part of the 200 program of record aircraft for the U.S. Marine Corps.

Under the terms of the contract, known as Low Rate Initial Production (LRIP) Lot 2 and 3, Sikorsky will begin deliveries of 12 CH-53K helicopters in 2022, and also provide spares and logistical support. Sikorsky remains committed to continuing to reduce costs over the life of the program. Read the Navy's announcement.

"I'm proud of the joint government and industry team in achieving this award," said Col. Jack Perrin, U.S. Marine Corps program manager for the Naval Air Systems Command's Heavy Lift Helicopters program, PMA-261.

The CH-53K is the only sea-based, long range, heavy-lift helicopter in production and will immediately provide three times the lift capability of its predecessor. The aircraft will conduct expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations deep inland from a sea-based center of operations. The new CH-53K will have heavy-lift capabilities that exceed all other DoD rotary wing-platforms and it is the only heavy lifter that will remain in production through 2032 and beyond.

"Sikorsky employees and our nationwide supply chain are ready to ramp up CH-53K production to support deployment of this modern, safe and reliable aircraft in 2023-2024," said Sikorsky Program Director Bill Falk. "This contract demonstrates the U.S. Marine Corps' confidence in Sikorsky to expand production of this technologically advanced heavy lift helicopter."

Lockheed Martin, Sikorsky, and its suppliers have made significant investments in facilities, machinery, tooling, and workforce training to ramp-up production required for the CH-53K program. For example, we have installed more than eight new titanium machining centers, designed and implemented a new final assembly test facility with multi-floor ergonomic work platforms, installed 10-ton cranes, and now have 3D work instructions on the factory floor.

"We have transformed our factory for the future and implemented a model for all future helicopter programs," Falk said. "Additionally, our engineers have implemented the latest technologies such as manufacturing simulation and 3D laser inspection technology. These investments in systems, personnel, and our facilities have elevated Sikorsky's manufacturing technology and capabilities to meet production requirements of the CH-53K for domestic and international customers."

The all-new CH-53K, designed to be intelligent, reliable, low maintenance and survivable in the most difficult conditions, has flown more than 1,400 test hours and has met all the outer reaches of the test envelope. The King Stallion is in the midst of a rigorous test program to ensure militaries can safely move troops and equipment at higher altitudes, quicker and more effectively than ever.

The CH-53K, which has proven it can lift more than 36,000 pounds, is the most powerful heavy lift helicopter ever built in the United States. The King Stallion's technologically advanced design will meet the future warfighting requirements for decades to come, enabling missions like humanitarian aid, troop and equipment transport, casualty evacuation (CASEVAC), support of special operations forces, and combat search and rescue (CSAR).

Accomplishments to date include: high altitude, hot temperature, and degraded visual environment flights, maximum weight single-point cargo hook sling load of 36,000 pounds; forward flight speed of over 200 knots; 60 degrees angle of bank turns; altitude of 18,500 feet mean sea level (MSL); 12-degree slope landings and takeoffs; external load auto-jettison; and gunfire testing.

(Image provided with Lockheed Martin news release)

FMI: www.ch-53k.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC