Report Says F-35 Is A 'Bad Deal' For The U.S. Military | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Dec 20, 2013

Report Says F-35 Is A 'Bad Deal' For The U.S. Military

Non-Profit Research Company Rand Corp. Releases Study Of The JSF Program

A study released this week by the non-profit Rand Corporation indicates that building one airplane to serve three military branches will not save money over building separate airplanes for the Air Force, Navy, and Marine Corps. The study says rather than saving money, it's likely to be more expensive.

Bloomberg News reports that the Rand research institution questions the Pentagon's fundamental assumptions about the F-35, analyzing its estimated $1.5 trillion "life-cycle cost" which includes acquisition and long-term fleet support. The report indicates that "under none of the plausible conditions we analyzed" did the airplane have a lower life cycle cost estimate.

Lorriane Martin, general manager of the F-35 program, admitted to reporters in a briefing last week that the airplane had seen some "challenges, but I would tell you, 'Come look at us today.'"

She said the per-aircraft costs are coming down as the company meets delivery and capability commitments and flight testing milestones.

The initial goal was for the F-35 to have 80 percent common airframe components across the three variants. Bloomberg reports that by 2008, that estimate varied to between 27 percent and 43 percent as challenges in development were addressed and prime contractor Lockheed Martin looked for weight savings on the airplane.

Rand said that "The tension between maintaining maximum commonality and meeting different service requirements has been difficult to resolve.” The end result is "less common variants, greater technical complexity and risk”, as well as difficulty in “achieving the promised savings.”

The report also points out that because of the one-plane-fits-all approach, Lockheed Martin is now the only prime contractor with an advanced stealth fighter program "for the foreseeable future." The study found that the lack of competition in that arena may lead to less innovation and higher prices.

(Image from file)

FMI: www.rand.org

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC