Boeing Delivers 1st US Army Multiyear II Configured Chinook | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Aug 08, 2014

Boeing Delivers 1st US Army Multiyear II Configured Chinook

One Of 155 Aircraft To be Delivered Under $4 Billion Contract

Boeing has delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, PA.

“This delivery is an example of teamwork and commitment to the troops in the field,” said Col. Rob Barrie, project manager, Cargo Helicopter Office, accepting the aircraft for the U.S. Army.

Boeing was awarded a $4 billion multi-year contract in June 2013 that included 155 CH-47Fs and options for an additional 60 aircraft. Deliveries for this contract are expected to continue through 2019. International customers on contract to receive this advanced configuration include Australia, Turkey and the United Arab Emirates.

“This delivery demonstrates Boeing’s ongoing commitment to our customers,” said Steve Parker, vice president, Cargo Helicopters and H-47 program manager. “Experienced teams worked together to deliver the advanced, multimission capability of this aircraft to meet the Army’s needs today and well into the future.”

The multiyear II configuration incorporates a number of product improvements such as the new Cargo-On-Off-Loading system that enables rapid re-configuration of the floor for cargo missions and the Cargo Platform Heath Environment system that provides real-time health monitoring to further reduce maintenance actions and ultimately reduce the overall life cycle cost of the product.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC