P&W Field Support and Training System Gets USAF's OK | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Mar 19, 2003

P&W Field Support and Training System Gets USAF's OK

Pratt & Whitney's (P&W) F119-PW-100 engine (powering the F/A-22 Raptor fighter aircraft) has received Support System Release (SSR) approval from the U.S. Air Force, signifying that the engine's field support program is ready for operational service.

The F119's field support and training system includes training programs for maintenance technicians, processes for deploying spare engines and parts, engineering and logistics support programs, tools, and technical order data. To achieve SSR, all elements of the F119's support system underwent extensive validation and verification testing over a five-year period. The system successfully demonstrated its capability in meeting all requirements of an operational fighter engine program.

"We are pleased to grant SSR approval to the F119's field support system," said Brig. Gen. (Sel) Thomas J. Owen, F/A-22 System Program Office Director, U.S. Air Force. "The team of Pratt & Whitney and the U.S. Air Force has worked well together to assure that both the engine and its support system are ready to transition to an operational environment."

Engine Shines as Airframe Program Faces Hurdles

"The F119 engine received ISR, initial service release, from the Air Force earlier in the year, signifying that the engine is ready for operational service. Now with the achievement of SSR certification, the total engine program is truly ready for initial field operation," said Bennett Croswell, P&W Director of F119 engine programs. "We now have F119 initial operational support capability at Nellis Air Force Base, the first operational base for the F/A-22. The people and the systems are on base, trained, and ready to support the U.S. Air Force and the F/A-22 team as this superb aircraft advances to operational service."

The F119's field support program represents the first time that a new production fighter engine and its support system have been developed at the same time. This "integrated product development" concept has resulted in what is projected to be the easiest and lowest-cost fighter engine to maintain in the field.

"A team of Pratt & Whitney engineers and U.S. Air Force maintenance professionals worked through many issues that plague maintainers in the field, and the results are often simple yet dramatic," Croswell said. "For example, we judiciously sought common bolt and nut sizes to attach external components to the engine, which has resulted in the need for just six hand tools to remove any external component on the F119. Also, all external components are placed just one layer deep on the engine, so you don't have to remove one component to get at another one. In all, it takes on average just 20 minutes to remove and replace any external component on the F119, which is a significant improvement over legacy engines." An evolution of the F119, the F135, will power the new F-35 Joint Strike Fighter.

FMI: www.pratt-whitney.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC