NASA Issues RFP For Ares I Upper Stage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Feb 25, 2007

NASA Issues RFP For Ares I Upper Stage

Awards Turbine Pump Assembly To Hamilton Sundstrand

The plan for NASA's next generation space vehicle is starting to come together. On Friday, the space agency issued a request for proposal for the Ares I launch vehicle upper stage element. Ares I is the launch vehicle that will transport the Orion crew exploration vehicle and its crew and cargo to low Earth orbit.

The upper stage proposals are due to Marshall Space Flight Center no later than 1 p.m. CST April 13, 2007.

The request for proposal states the procurement approach for obtaining the upper stage element. The selected contractor will produce the required Ares I upper stage and provide support to a NASA-led design team during the design phase.

The contract will provide for the manufacture and assembly of test articles, flight test units, and the operational upper stage elements to support NASA's flight manifest through 2016. Final manufacturing and assembly will take place at NASA's Michoud Assembly Facility in Louisiana.

The Ares I upper stage, with a separately procured upper stage engine and a separately procured instrument ring, will provide the navigation, guidance, control and propulsion required for the second stage of the Ares I ascent.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle but with a fifth motor segment attached.

The contract to manufacture and assemble the Ares I upper stage element will be awarded through a full and open competition and managed by NASA's Marshall Space Flight Center in Huntsville, AL.

A selection will be made in August 2007.

NASA also announced Friday it selected Hamilton Sundstrand Space Systems International Inc. of Rockford, IL to design, develop, fabricate, test and deliver engineering models of a turbine pump assembly for the Ares I upper stage thrust vector control subsystem.

That two year, cost-plus-fixed-fee contract is worth approximately $5 million.

FMI: View The RFP, www.nasa.gov/ares

Advertisement

More News

TikToker Arrested After Landing His C182 in Antarctica

19-Year-Old Pilot Was Attempting to Fly Solo to All Seven Continents On his journey to become the first pilot to land solo on all seven continents, 19-year-old Ethan Guo has hit a >[...]

Classic Aero-TV: Versatile AND Practical - The All-Seeing Aeroprakt A-22 LSA

From 2017 (YouTube Edition): A Quality LSA For Well Under $100k… Aeroprakt unveiled its new LSA at the Deland Sport Aviation Showcase in November. Dennis Long, U.S. Importer>[...]

ANN's Daily Aero-Term (06.27.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (06.27.25)

Aero Linx: Historic Aircraft Association (HAA) The Historic Aircraft Association (HAA) was founded in 1979 with the aim of furthering the safe flying of historic aircraft in the UK>[...]

Aero-News: Quote of the Day (06.27.25)

"We would like to remember Liam not just for the way he left this world, but for how he lived in it... Liam was fearless, not necessarily because he wasn't afraid but because he re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC