2nd Ariane 5 To Be Launched This Year Enters Assembly Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Mar 11, 2010

2nd Ariane 5 To Be Launched This Year Enters Assembly Process

Ariane Plans A Total Of Seven Mission In 2010

The Ariane 5 for Arianespace's second dual-payload flight of 2010 has begun its assembly as the Spaceport in French Guiana is once again the center of activity for two parallel missions.

This latest Ariane 5 began taking shape earlier in the week as its cryogenic core stage was positioned over a mobile launch table in the Spaceport's Launcher Integration Building. It was then joined by the vehicle's two solid boosters for mating.

The second mission of 2010 will utilize a heavy-lift Ariane 5 ECA version of Arianespace's workhorse launcher, and will carry two telecommunications satellites.

As the launch campaign begins for this flight, another Ariane 5 ECA is in the Spaceport's Final Assembly Building, where it is awaiting the integration of its two satellite passengers: ASTRA 3B & COMSATBw-2. The liftoff of this year-opening Arianespace launch is set for March 24.

Arianespace is targeting a total of seven Ariane 5 missions during 2010 while preparations also continue for the upcoming introductions of the medium-lift Soyuz and lightweight Vega launcher in side-by-side operations at the Spaceport.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC