Epic E1000 GX Sees FIKI Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Thu, Dec 07, 2023

Epic E1000 GX Sees FIKI Certification

Single-Engine Turboprop Gets All-Weather Capability

Epic Aircraft's E1000 GX turboprop gained FAA certification for Flight Into Known Icing (FIKI), improving livability and safety for operators in an even greater number of missions. 

The certification was a long time coming, said Epic CEO Doug King. He said it was "one of the most challenging" that the company had faced during E1000 development. "We began testing several years ago, flying the E1000 GX in all of the FAA-specified natural icing conditions. This FAA certification establishes that the E1000 GX can withstand known icing conditions in a real-world operating environment with minimal changes required of the airplane."

The first test flight used a set of artificial 3d-printed ice chunks affixed to an E1000 test bed, with more than 450 flight hours spent across a trio of similar aircraft. The faux ice gave way to real world conditions later in the process, in addition to wind tunnels as they examined a variety of failure modes and error states. All in all, the ice testing saw 18 different icing configurations applied to the E1000 GX, totalling up to more than 280 hours of wind tunnel testing.

The E1000 GX's de-icing suite includes an optical ice detector, de-ice boots on the wings, horizontal stabilizer leading edges, engine inlet, in addition to bleed air heated windshield and electrically heated propeller, air data probes, and AOA sensors.

“Beginning with our first aircraft delivery in 2024, the E1000 GX will incorporate the minimal changes required for FIKI. Previously delivered certified airplanes, including the E1000, will require modifications and will be retrofitted at our factory service center in Bend, Oregon,” said King. “Our goal is to have the existing fleet completed no later than early 2025.”

FMI: www.epicaircraft.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC