Pad 39A Conversion Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Mon, Nov 24, 2014

Pad 39A Conversion Underway

SpaceX Modifying The Historic Site For Its Falcon Heavy Rocket

Modifications of launch Pad 39A at the Kennedy Space Center are underway, as SpaceX prepares for the first launch of a Falcon Heavy rocket from the historic facility.

The pad was mothballed by NASA and the Kennedy Space Center after the shuttle program ended in 2011. It was one of the last visible reminders of that era of space travel.

With all SLS launches planned for pad 39B, NASA awarded the right to repurpose 39A to SpaceX, and the private company hopes to be able to launch the first of its new heavy rockets next summer.

NASASpaceflight.com reports that most of the work currently underway seems to be on the perimeter of the launch site, and a SpaceX says that the pad will retain much of its current appearance. For Instance, according to SpaceX spokesman John Taylor, the Rotating Service Structure (RSS) that had been an integral part of the payload installation process for the Shuttle will remain in place. There had been speculation that SpaceX would also add to the Fixed Service Structure (FSS) at the pad, but Taylor said that for now, it will remain at its current height, but with some structural reinforcements.

A date of July 1, 2015 has been set for a "Wet Dress Rehearsal" (WDR) for the Falcon Heavy to validate the rocket and launch systems. The next steps would be a Static Fire test and a Launch Readiness Review before the actual first flight test is conducted.

(NASA image of Discovery at Pad 39A)

FMI: www.spacex.com

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC