FAA Proposes AD For Some GE CF34-8C And CF34-8E Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 15, 2012

FAA Proposes AD For Some GE CF34-8C And CF34-8E Engines

Two Instances Of Engine Fires Prompted The Move

The FAA posted a proposed AD in the Federal Register Thursday for all General Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed valves (OBV) installed. This proposed AD was prompted by three failure events of ring lock fuel  fittings on the OBV. Two of those events led to an engine fire. This  proposed AD would require the affected OBVs be removed from service and  replaced with OBVs eligible for installation. The FAA is proposing this AD  to prevent failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.

The agency received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two of those events led to an engine fire. Investigation revealed that the ring lock fittings failed due to fatigue caused by improper broaching of the OBV housing during manufacture, and, improper installation of the ring lock fittings during OBV assembly. GE CF34-8E turbofan engines also use the affected OBVs and would be affected by this proposed AD.

The FAA says that this condition, if not corrected, could result in failure of OBV ring lock fuel fittings, engine fuel leakage, uncontrolled fire, and damage to the airplane.

The repairs are expected to affect some 300 engines installed on Embraer and Bombardier airplanes of U.S. registry. The FAA estimates that it would take about two hours per engine to perform the actions required by this proposed AD, and that the average labor rate is $85 per hour. Required parts would cost about $25,000 per engine. Based on these figures, we estimate the total cost of the proposed AD to U.S. operators to be $7,551,000.

Comments on the proposed AD are due to the FAA by February 11, 2013.

FMI: Proposed AD

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC