University of Dubuque Upgrades Aviation Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 26, 2024

University of Dubuque Upgrades Aviation Program

Celebrates 50 Years With Massive Learning Center Expansion

The University of Dubuque announced plans on November 21 that would provide substantial upgrades to its Aviation Learning Center and flight ramp. These improvements were revealed during the UD Aviation Program’s 50th anniversary celebration.

UD’s aviation program currently includes three major/minor opportunities: applied aviation technology, aviation management, and flight operations. It launched in 1974 running on two aircraft and 35 students. As of January 2025, the department will operate 31 Cessna 172s, three Piper Seminoles, and two Guimbal Cabri G2 helicopters. So far, the program has produced 1,300 graduates.

“We're over 400 students now with plans to go to 5-600 students,” stated Randy Warm, UD’s Director of Aviation Programs. “With that, we need resources to accommodate that number of students so we have the planes that we ordered and received. So we're good on planes and right now with instructors, but the physical size of the building needs to adjust."

The institute’s Aviation Learning Center was only completed five years ago, but the program’s rapid growth has quickly overtaken it. The facility will be receiving a 15,000-square-foot upgrade with a new classroom, debrief areas, workstations, offices, and 20 flight simulators for more efficient training. The parking lot will also be growing from 50 spots to nearly 300.

Additionally, the flight ramp is going to be getting an almost 59,000 square foot expansion. This will allow UD’s entire fleet to be tied down on the ramp when needed, or put in one of the two planned hangar constructions.

“The aviation expansion demonstrates a firm commitment by the University of Dubuque and the Board of Trustees to provide our students with the best resources and facilities to achieve a top-tier aviation education,” Warm continued. “This expansion takes into consideration the planned growth and expected trends for the next 20 years that will keep the University of Dubuque's aviation program at the top.”

The university is slated to break ground on the upgrades after receiving final approval from the FAA and Dubuque Regional Airport Commission. UD hopes to complete the project in December of 2026.

FMI: www.dbq.edu/Aviation

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC