Spacewalkers Inspect Damage To Solar Array | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Wed, Oct 31, 2007

Spacewalkers Inspect Damage To Solar Array

Fourth Excursion Planned For Thursday

NASA tells ANN astronauts and ground controllers are looking at apparent damage to the P6 4B solar array spotted by the crew during deployment. NASA halted the deployment of the solar array wing to evaluate the damage. Deployment is about 75 percent complete with 25 of 31 bays deployed.

The crew has been asked to photograph the area on the solar array wing and downlink the images to the ground.

Meanwhile during post-spacewalk activities, Mission Specialist Doug Wheelock reported to the ground that he has noted a hole in one of his gloves. He is sending photos to the ground for assessment.

Along with fellow Mission Specialist Scott Parazynski, Wheelock helped install the P6 truss in its permanent location and inspected the port Solar Alpha Rotary Joint today during STS-120’s third spacewalk. The seven-hour, eight-minute excursion wrapped up at 1153 EDT Tuesday.

Shortly after the spacewalk began, Parazynski and Wheelock went to work at the end of the port truss to help station robotic arm operators attach the P6 to its new location on P5. The two provided verbal cues to Expedition 16 Flight Engineer Dan Tani and Mission Specialist Stephanie Wilson as they aligned the truss. Once the 17.5 ton truss was in place, the spacewalkers secured it and attached its power source.

After completing the truss work, Parazynski inspected the port rotary joint and found no evidence of any debris. He described the joint's race rings as "nice and clean." The spacewalkers also installed a spare main bus switching unit on a station storage platform.

Mission Specialist Paolo Nespoli coordinated today’s spacewalk activities. Pilot George Zamka was the shuttle robot arm operator.

STS-120’s fourth spacewalk to perform additional inspections of the starboard rotary joint will take place Thursday.

(Image and story courtesy of NASA)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC