Bell Boeing Delivers First Modified Osprey For Improved Fleet Readiness | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 14, 2019

Bell Boeing Delivers First Modified Osprey For Improved Fleet Readiness

Upgrade Reduces Configuration Types To Streamline Maintenance And Repairs

Boeing and Bell Textron have delivered the first modified MV-22 Osprey to the United States Marine Corps for improved readiness and reliability of the tiltrotor fleet.

The Marines have multiple configurations of the MV-22 aircraft in service. Under the Common Configuration – Readiness and Modernization (CC-RAM) program, Bell Boeing is reducing the number of configurations by upgrading block “B” aircraft to the current block “C” configuration.

“Our first CC-RAM aircraft returning to Marine Corps Air Station New River was a key program benchmark,” said U.S. Marine Corps Col. Matthew Kelly, program manager, V-22 Joint Program Office (PMA-275). “We are excited to see the capability, commonality and readiness improvements these CC-RAM aircraft bring to the fleet as part of the Marine Corps’ V-22 readiness program.”

As a block “B” configuration, this MV-22 was originally delivered to the fleet in 2005. In 2018, the aircraft flew from Marine Corps Air Station New River to the Boeing Philadelphia facility for modernization.

“This milestone marks the beginning of an Osprey evolution,” said Kristin Houston, vice president, Boeing Tiltrotor Programs and director, Bell Boeing V-22 Program. “Through a shared focus on safety and quality, the Bell Boeing team is delivering modernized MV-22 aircraft that are ready to serve our dedicated servicemen and women who rely on this essential aviation resource.”

The next CC-RAM delivery is expected in early 2020.

“We look forward to having the remaining MV-22 block “B” aircraft rejoin the fleet in a block “C” configuration,” said Kelly.

In November 2019, the U.S. Navy awarded Bell Boeing $146,039,547 to upgrade nine additional MV-22 aircraft under the CC-RAM program, with work expected to be completed in March 2022.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC