Final Pieces Of Ares I-X Flight Test Rocket Head To Launch Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Mar 17, 2009

Final Pieces Of Ares I-X Flight Test Rocket Head To Launch Site

Now Making 2,900-Mile Cross-Country Journey From UT To KSC

The final pieces of the Ares I-X flight test rocket left the Alliant Tech Systems manufacturing facility in Promontory, UT Thursday and began a 2,917-mile journey to its launch site at NASA's Kennedy Space Center in Florida.

The first stage motor segments are the last shipment of Ares I-X major hardware elements. The hardware will arrive in Florida later this month and undergo final processing and preparations before being stacked with the other portions of the rocket.

"This shipment means great things for the Ares I-X mission," said Ares I-X Deputy Mission Manager, Steve Davis. "It's wonderful to see the next generation of American spaceflight continue to take shape. The excitement is really building now as we start stacking the pieces and preparing for launch later this year."

The Ares I-X will be the first flight test for the Ares I rocket; the agency's next-generation spacecraft and crew launch vehicle system. The flight will provide NASA an early opportunity to test and prove hardware, analysis models, facilities and ground operations associated with Ares I.

The Ares I-X rocket is a combination of existing and simulator hardware that will resemble the Ares I rocket in size, shape and weight. It will provide valuable data to guide the final design of the Ares I. The test flight also will bring NASA one step closer to its goals of returning to the moon, and traveling to destinations beyond. The Ares I-X launch is scheduled later in 2009.

The Ares I-X first stage uses a four-segment solid rocket motor, capable of generating 3.3 million pounds of thrust. The motor provides the primary propulsion for the vehicle from liftoff to stage separation 120 seconds into the flight. The motor segments were taken from the existing space shuttle solid rocket booster inventory for the flight test. The booster used for the Ares I-X flight test is being modified to meet Ares needs by adding new forward structures and a fifth segment simulator to better replicate the size and shape of the Ares I crew launch vehicle.

FMI: www.nasa.gov/mission_pages/constellation/ares/flighttests/aresIx/index.html

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC