Shuttle Engines Test-Fired At Stennis Space Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Oct 27, 2005

Shuttle Engines Test-Fired At Stennis Space Center

First Time Since Katrina

For the first time since Hurricane Katrina, NASA's Stennis Space Center, MS, returned to its primary business today, testing space shuttle main engines.

Engineers successfully test-fired an engine for 520 seconds; the time it takes a shuttle to reach orbit. Today's engine test is an indication that Stennis and the region are working toward recovering from the storm.

Today's test was a continuation of a certification series on the Advanced Health Management System, which monitors the engine's performance. It enables the engine to shut down if unusual vibrations are detected in the turbopump. It's an upgrade that provides a significant improvement for lower risk for shuttle main engines. Other engine parts were tested and certified, such as a fast-response temperature sensor.

"We are very pleased to be testing again," said Gene Goldman, manager of the Space Shuttle Main Engine Project Office at NASA's Marshall Space Flight Center, Huntsville, AL. "It's a testament to the dedication and character of the Stennis workforce that they are able to test so soon after hurricanes Katrina and Rita." Approximately 25 percent of Stennis' 4,500 employees lost their homes, and the majority had varying degrees of damage.

Stennis has tested and proven flight-worthy every space shuttle main engine since the first in 1975.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC