Boeing Simultaneously Conducting Fatigue Testing On Five Platforms | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Feb 12, 2015

Boeing Simultaneously Conducting Fatigue Testing On Five Platforms

Tests Can 'Age' A Plane 10 Years In Just A Few Weeks

For the first time, Boeing is simultaneously conducting fatigue tests - a set of rigorous lab tests that help ensure product quality - on five aircraft.

In order for Boeing engineers to know how aircraft will hold up long-term under harsh flight conditions, they must put the airframes through rigorous lab testing. These full-scale fatigue tests involve twisting, pulling and pushing on the planes, simulating real-world flying conditions. In some cases, the tests can “age” a plane 10 years or more in just a few weeks. Once engineers see how these aircraft respond to duress, they can address any problems and ensure that Boeing customers receive the highest-quality products.

It’s a huge task to undertake even one fatigue test, but Boeing Test & Evaluation, the company's centralized test and evaluation organization, is going much further.

Currently five different aircraft programs are conducting full-scale fatigue testing in Seattle and St. Louis: the 787 Dreamliner, the Air Force’s F-15C and F-15E, the Air Force’s B-1B and the Navy’s P-8A Poseidon. It’s believed this is the first time Boeing has ever undertaken five fatigue tests at once, and it allows engineers to collaborate with other programs and share best practices.

(Images provided by Boeing)

FMI: www.boeing.com


Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC