Mobility Air Forces Awards KC-46A Mission Planning Delivery Order | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 15, 2016

Mobility Air Forces Awards KC-46A Mission Planning Delivery Order

Work To Span More Than Two Years

An Engineering Change Proposal (ECP) for KC-46A Mission Planning under the Mobility Air Forces (MAF) Delivery Order on the U.S. Air Force's Mission Planning Enterprise Contract (MPEC) II has been awarded to engineering firm DCS.

MPEC II provides aircraft mission planning systems for the United States Air Force, Navy and Marine Corps. Work on the MAF KC-46A ECP will occur over a twenty six-month period and is valued at approximately $7.9 million.

Under this delivery order, DCS will provide mission planning software development and integration to create a Joint Mission Planning System (JMPS) mission planning environment (MPE) for the KC-46A aircraft. The KC-46A effort builds upon other DCS-developed JMPS MPEs for the C-5, KC-135, KC-10 CNS/ATM, C-130J Block 6, C-130J Block 8.1, C-17 Blocks 15-20, and C-130 SCNS Block Cycles 7 and 8 platforms as well as the Global Flight Planning (GFP) Tool for user access to the Advanced Computer Flight Plan (ACFP) system. Work awarded under the delivery order will be performed at DCS offices in Nashua, NH and Lexington Park, MD by the Mission Planning Department, whose software engineering processes are appraised at the CMMI Maturity Level 3.

DCS is a strong advocate of designing and building "tomorrow's DoD capabilities within today's budget." In this regard, DCS will continue to form strategic partnerships with other industry members to lead successful teams to continue to provide highly-capable, low-risk, proven mission planning systems.

(Source: DCS Corporation news release. Image from file)

FMI: www.dcscorp.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC